Use documented hardware dependency category for qualification handoff

John Lauer ·fb15a22d6a · ·parent bbb7af8
1 file changed +1−1
aiflow/run/physical-qualification-dependency.json+1−1
@@ -1,6 +1,6 @@ {   "kind": "external-dependency",-  "category": "physical-evidence",+  "category": "hardware",   "reason": "Thermal acceptance requires installed low-rise cooling and sensor/lag evidence that is not available from catalog values or CAD. Current candidate is not qualified and the bring-up image is permanently output locked.",   "dependency": "A reviewed assembled-prototype qualification setup and measured thermal/fault traces, plus verified 3rdPartyFab minimum finished surface/barrel copper. Supplier data must establish the actual TIM/clamp and installed sink assumptions before those can be adopted.",   "resumeWhen": "Prototype availability, the finished-copper specification, or supported supplier/interface data is supplied; recheck current run and continue the corresponding design or measurement task. No cooling-size choice is required.",