← Commit history
docs/remote-service-clips.md+11−1
@@ -1,6 +1,16 @@+# Latest: corrected R7 probing replay++15-second Adom TTS narrated Probe Twin clip: the medium ground pin enters J7, the pincers release and rise, and the probe approaches the test pads. Large scaffold pins remain unchanged. The exact-input R7 run passes all six nominal probing checks. Browser sampling of 151 event midpoints found no reported tether snags or jaw penetrations against 5,237 component/exclusion envelopes. **Simulated access only; thermal and physical qualification remain open.**++::adom-video{video="/adom/adom-custom-electronic-load/render/videos/remote-service/probe-r7-review.mp4" poster="/adom/adom-custom-electronic-load/render/videos/remote-service/probe-r7-review.jpg" captions="/adom/adom-custom-electronic-load/render/videos/remote-service/probe-r7-review.vtt"}++Recorded, narrated and rendered on arav-rog. Playback is accelerated and conformed to continuous narration; captions remain separate. [Input correction, source fix and thermal decision](r7-probing-and-thermal-review.md).++---+ # Latest: current-path repair -18-second narrated R5/R7 native-route comparison. The fused-supply elbow shifts and widens without entering the washer keepout. The0.1mm Fields peak drops69.78→59.72A/mm²; the limit remains60 and the small0.47% margin is disclosed. Native DRC0/0 and current screening pass. The revision-specific probing pass was withdrawn after copied input paths were found stale; a corrected rerun is pending. Thermal and physical qualification remain open.+18-second narrated R5/R7 native-route comparison. The fused-supply elbow shifts and widens without entering the washer keepout. The0.1mm Fields peak drops69.78→59.72A/mm²; the limit remains60 and the small0.47% margin is disclosed. Native DRC0/0 and current screening pass. The revision-specific probing pass was withdrawn after copied input paths were found stale; the corrected R7 rerun now passes all six nominal probing stages (see the latest clip above). Thermal and physical qualification remain open.  ::adom-video{video="/adom/adom-custom-electronic-load/render/videos/remote-service/current-repair-review.mp4" poster="/adom/adom-custom-electronic-load/render/videos/remote-service/current-repair-review.jpg" captions="/adom/adom-custom-electronic-load/render/videos/remote-service/current-repair-review.vtt"} 
videos/remote-service/probe-r7-recording.jsonadded+8
@@ -0,0 +1,8 @@+{
+  "file": "C:\\Users\\arav\\adom-projects\\electronic-load-media\\videos\\remote-service\\probe-r7-review.mp4",
+  "seconds": 15.459333333333333,
+  "captionsBurned": false,
+  "narration": "Adom TTS Andrew +15%, silences trimmed",
+  "rawHost": "arav-rog",
+  "scope": "Actual Probe Twin replay; task-local obstacle patches, R7 exact-input run. SIMULATED, not physical qualification. Captured at 1.3x replay speed; conformed to continuous narration."
+}\ No newline at end of file
videos/remote-service/probe-r7-review.jpgadded
⋯ 1 unchanged line ⋯
videos/remote-service/probe-r7-review.mp4added
⋯ 1 unchanged line ⋯
videos/remote-service/probe-r7-review.vttadded+14
@@ -0,0 +1,14 @@+WEBVTT
+
+00:00:00.000 --> 00:00:02.676
+The ground pin now enters its own medium receiver.
+
+00:00:02.676 --> 00:00:05.054
+The large corner pins still support the board.
+
+00:00:05.054 --> 00:00:10.405
+Here the probe approaches the test pads while the tether is checked against the heatsink, bracket, and wiring.
+
+00:00:10.405 --> 00:00:15.459
+All six checks pass on this exact revision. This is simulated access; thermal qualification is still open.
+