← Commit history

Record shortened fan harness and nominal probe-clearance result

John Lauer ·44776e733c · ·parent 6b845a7
4 files changed +22−1
docs/remote-service-clips.md+11−1
@@ -1,4 +1,14 @@-# Latest process clip: a shorter route still needs probe clearance+# Latest process clip: moving the fan connector clears the probe++This 12-second narrated before/after model review shows J9 moving 3 mm toward the fan. All four wires follow the actual native connector position and become shorter. The candidate passes native DRC with zero violations/opens, static wire-solid clearance, and all six input-bound nominal probing stages. Physical qualification, browser/CLI tether parity, and electrical/thermal acceptance remain open. This is saved-model review footage, not a successful workcell replay or a fabrication release.++::adom-video{video="/adom/adom-custom-electronic-load/render/videos/remote-service/fan-clearance-before-after.mp4" poster="/adom/adom-custom-electronic-load/render/videos/remote-service/fan-clearance-before-after.jpg" captions="/adom/adom-custom-electronic-load/render/videos/remote-service/fan-clearance-before-after.vtt"}++Recorded and rendered on arav-rog with matched moving views, Adom TTS narration, silence trimmed, and separate captions. Raw footage remains there. The 5 W bring-up cap is unchanged.++---++# Earlier process clip: a shorter route still needs probe clearance  This 15-second narrated before/after review shows TP16 moving closer to L1: BOOST_SW routing shrinks from15.4mm to11.63mm and loses two vias. Native DRC passes, but the subsequent full coverage check **rejects this trial** because the probe body is too close to fan connector J9. It is preserved as design-process evidence, not an approved board or a successful workcell replay. The next candidate moves test access toward the regulator. 
videos/remote-service/fan-clearance-before-after.jpgadded
⋯ 1 unchanged line ⋯
videos/remote-service/fan-clearance-before-after.mp4added
⋯ 1 unchanged line ⋯
videos/remote-service/fan-clearance-before-after.vttadded+11
@@ -0,0 +1,11 @@+WEBVTT
+
+00:00:00.000 --> 00:00:02.989
+The fan connector was too close to the probe head.
+
+00:00:02.989 --> 00:00:07.174
+Moving it toward the fan gives the probe room and shortens all four wires.
+
+00:00:07.174 --> 00:00:12.255
+This exact assembly now passes all six nominal probing checks. Electrical and thermal qualification are still open.
+