Record rejected short-route trial and explain remaining probe-body clearance

John Lauer ·6b845a783c · ·parent 4f1a101
4 files changed +23−2
docs/remote-service-clips.md+12−2
@@ -1,4 +1,14 @@-# Latest process clip: finding the pincer-clearance fault+# Latest process clip: a shorter route still needs probe clearance++This 15-second narrated before/after review shows TP16 moving closer to L1: BOOST_SW routing shrinks from15.4mm to11.63mm and loses two vias. Native DRC passes, but the subsequent full coverage check **rejects this trial** because the probe body is too close to fan connector J9. It is preserved as design-process evidence, not an approved board or a successful workcell replay. The next candidate moves test access toward the regulator.++::adom-video{video="/adom/adom-custom-electronic-load/render/videos/remote-service/switch-node-before-after.mp4" poster="/adom/adom-custom-electronic-load/render/videos/remote-service/switch-node-before-after.jpg" captions="/adom/adom-custom-electronic-load/render/videos/remote-service/switch-node-before-after.vtt"}++Recorded and rendered on arav-rog. Matched moving views of saved native-board exports; Adom TTS narration, silence trimmed, separate selectable captions. No burned-in subtitles. Raw clips remain on arav-rog.++---++# Earlier process clip: finding the pincer-clearance fault  This narrated 3D model review explains why raising the probe alone did not clear the heatsink: the pincer has an independent Z axis. It is retrospective model footage, not a recording of a successful workcell replay. The subsequent local CLI checks pass all six nominal probing stages with a 45 mm pincer rise and a cable-routing envelope outside the fin bank. Physical qualification and browser/CLI tether parity remain pending. @@ -12,7 +22,7 @@ Recorded and narrated on arav-rog. Captions are selectable, not burned into the  ## Superseded probing replay — invalid ground-pin mate -The ground pincer seats its pin and the probe visits rail test points, then the relocated BOOST_SW pad TP16. Travel is accelerated and waiting is cut. Adom TTS narration; selectable captions. The former six-stage pass is withdrawn because its medium-to-large ground-pin mate was invalid. Current rework has passed native DRC but still fails assembled collision/tether checks. This historical clip does not qualify test access, electrical behavior or manufacturing tolerances.+The ground pincer seats its pin and the probe visits rail test points, then the relocated BOOST_SW pad TP16. Travel is accelerated and waiting is cut. Adom TTS narration; selectable captions. The former six-stage pass is withdrawn because its medium-to-large ground-pin mate was invalid. At that historical checkpoint, rework passed native DRC but failed assembled collision/tether checks. This historical clip does not qualify test access, electrical behavior or manufacturing tolerances.  ::adom-video{video="/adom/adom-custom-electronic-load/render/videos/remote-service/probe-tp16-v1.mp4" poster="/adom/adom-custom-electronic-load/render/videos/remote-service/probe-tp16-v1.jpg" captions="/adom/adom-custom-electronic-load/render/videos/remote-service/probe-tp16-v1.vtt"} 
videos/remote-service/switch-node-before-after.jpgadded
⋯ 1 unchanged line ⋯
videos/remote-service/switch-node-before-after.mp4added
⋯ 1 unchanged line ⋯
videos/remote-service/switch-node-before-after.vttadded+11
@@ -0,0 +1,11 @@+WEBVTT
+
+00:00:00.000 --> 00:00:05.339
+The probing pass exposed an electrical tradeoff. Moving the test point made the switch-node route too long.
+
+00:00:05.339 --> 00:00:11.934
+This candidate brings it closer, removes two vias, and cuts the route from fifteen point four to eleven point six millimeters.
+
+00:00:11.934 --> 00:00:15.074
+Native design checks pass; full probe clearance is being rechecked.
+