← Commit history

Rev 2 build status, 1:57 PM Central

John Lauer ·cc61206a6d ·1d ago ·parent a7f45e6
2 files changed +29
README.md+29
@@ -1,6 +1,35 @@ <!-- studio:begin --> # Ghost Hand +<!-- rev2-status:begin -->+## Rev 2 build status++Rev 2 is being built right now by three AI threads in Adom Hydrogen; this section follows their work. Last updated Nov 8, 1:57 PM Central.++| Stage | | What it covers |+|---|---|---|+| Aim | **done** | faucet drawing, window height and the tilt |+| Case | **done** | the smaller sealed case, light pipes, engraving |+| Parts | **done** | every part in stock with its symbol, footprint and 3D |+| Placement | *in progress* | parts placed on both sides of the 30 x 22 mm board |+| Routing | next | every net routed, vias and copper pours |+| Silkscreen | next | names of every light and part, 0.6 / 0.3 mm text |+| Checks | next | DRC, current and heat (Adom Fields), finish |+| 3D | next | the finished board in 3D, inside the case |+| Fab files | next | Gerbers, drill, BOM and placement file |+| Wiki | *in progress* | this page, the hero image and the release |++| Thread | Now |+|---|---|+| Board (Claude) | 1:40 PM: Placement (back again): QFN escapes fixed for good by a keep-out under U1's pad field on the bottom, U5 1 mm forward, U4 turned 180 deg so SCL. |+| Case (Codex) | 1:55 PM: Case: DONE visually checked, outer 38 x 32 x 17 mm, tilt 5 deg, IR axis 13.733 mm above counter, mass 15.38 g estimate. |+| Studio and wiki (Claude) | 1:53 PM: Studio: rev 2 hero GLB trial with the real placed board inside the 13:48 case: 2.8 MB using step2glb's web LOD of the board. |++![The rev 2 board as of 1:12 PM](docs/status/board-777ce1cd.png)++*The latest rev 2 board model, 1:12 PM.*+<!-- rev2-status:end -->+ ::adom-video{src="/john/ghost-hand/render/docs/videos/ghost-hand-film.video.json"}  The film shows how **rev 1** was built: one prompt in Adom Hydrogen, AI Flow and three AI threads (two
docs/status/board-777ce1cd.pngadded
⋯ 1 unchanged line ⋯