project
Ghost Hand
Public Unreviewedby John Lauer
A small battery gadget that keeps an automatic sink faucet running while you use the sink: it learns the faucet's timeout, re-arms with the shortest blip, and stops after 10 minutes or when picked up.
← Commit history
aiflow run ghost-hand-claude-opus-5-5-20261106-1434: project-page
18 files changed
+174
docs/runs/ghost-hand-claude-opus-5-5-20261106-1434/README.md+174docs/runs/ghost-hand-claude-opus-5-5-20261106-1434/design-1-sheet.pngdocs/runs/ghost-hand-claude-opus-5-5-20261106-1434/design-1.mp4docs/runs/ghost-hand-claude-opus-5-5-20261106-1434/shot-design-1-end.pngdocs/runs/ghost-hand-claude-opus-5-5-20261106-1434/shot-design-1-start.pngdocs/runs/ghost-hand-claude-opus-5-5-20261106-1434/shot-parts-1-end.pngdocs/runs/ghost-hand-claude-opus-5-5-20261106-1434/shot-parts-1-start.pngdocs/runs/ghost-hand-claude-opus-5-5-20261106-1434/shot-project-page-1-start.pngdocs/runs/ghost-hand-claude-opus-5-5-20261106-1434/shot-rules-1-end.pngdocs/runs/ghost-hand-claude-opus-5-5-20261106-1434/shot-rules-1-start.pngdocs/runs/ghost-hand-claude-opus-5-5-20261106-1434/shot-sourcing-1-end.pngdocs/runs/ghost-hand-claude-opus-5-5-20261106-1434/shot-sourcing-1-start.pngdocs/runs/ghost-hand-claude-opus-5-5-20261106-1434/shot-test-plan-1-end.pngdocs/runs/ghost-hand-claude-opus-5-5-20261106-1434/shot-test-plan-1-start.pngdocs/runs/ghost-hand-claude-opus-5-5-20261106-1434/sourcing-1-sheet.pngdocs/runs/ghost-hand-claude-opus-5-5-20261106-1434/sourcing-1.mp4docs/runs/ghost-hand-claude-opus-5-5-20261106-1434/test-plan-1-sheet.pngdocs/runs/ghost-hand-claude-opus-5-5-20261106-1434/test-plan-1.mp4docs/runs/ghost-hand-claude-opus-5-5-20261106-1434/README.mdadded+174@@ -0,0 +1,174 @@+# AI Flow run: claude-opus-5-5 on board-0++**Running**: step `project-page`, 35.7 min of AI time since the prompt (53.4 min on the wall clock). This page updates at every step change.++Prompt at 2026-11-06T14:34:00Z (UTC). Flow: board. Every number here is from the run's append-only ledger (run.jsonl). AI time is the time the AI was working on a prompt: from the human's prompt to the AI's done, with any gap over 15 min where no command ran (unobserved, not proven idle) cut out.++## Sessions++One row per human prompt: the AI's time on it, unobserved gaps excluded by the heuristic, which may include external AI work.++| Session | Prompt at | Done at | AI time min | Unobserved gap min | What |+|---|---|---|---|---|---|+| 1 | 2026-11-06T14:34:00Z | (open) | 35.6 | 18 | the first prompt |+| **all** | | | **35.7** | | |++## Per step++AI time only, the idle cut out.++| Step | AI min | AI thinking min | Tool min | Turns | Visits | Returns | Longest think |+|---|---|---|---|---|---|---|---|+| intake | 2.9 | 2.9 | 0.0 | 1 | 1 | 0 | 2.8 min |+| design | 27.1 | 0.0 | 27.1 | 4 | 1 | 0 | 0.0 min |+| parts | 3.5 | 0.0 | 3.5 | 11 | 1 | 0 | 0.0 min |+| project-page | 0.0 | 0.0 | 0.0 | 2 | 1 | 0 | 0.0 min |+| rules | 0.4 | 0.3 | 0.1 | 4 | 1 | 0 | 0.3 min |+| sourcing | 1.1 | 0.0 | 1.1 | 4 | 1 | 0 | 0.0 min |+| test-plan | 0.7 | 0.0 | 0.7 | 2 | 1 | 0 | 0.0 min |+| **total** | **35.6** | **3.2** | **32.5** | | | | |++## Decisions along the way++- 2026-11-06T14:36:57Z clip-start:rules-1+- 2026-11-06T15:00:09Z clip guard: the rules clip ran 23 min, past its 10 min budget twice over; stopped by the guard+- 2026-11-06T15:00:26Z clip-start:design-1+- 2026-11-06T15:01:12Z clip-start:test-plan-1+- 2026-11-06T15:02:32Z clip-start:sourcing-1+- 2026-11-06T15:06:10Z clip-start:parts-1+- 2026-11-06T15:26:29Z clip guard: the parts clip ran 20 min, past its 10 min budget twice over; stopped by the guard+- 2026-11-06T15:27:24Z clip-start:project-page-1++## Where the board stands+++## The steps on camera++One clip per step visit, sped up 10x, with the editor at the start and the end of the visit. A caption above every clip and screenshot says what it shows.++### rules++What this step does: Choose the fab and load its design rules before anything is drawn: the AI asks the human which fab builds the board (3rdPartyFab by default, JLCPCB on request) and loads that fab's rule profile into the EDA (KiCad .kicad_dru, Fusion DRC rules), so every later step designs to the process that will build it.++**Clip: rules, still recording (started 2026-11-06T14:36:57Z); it appears here when the step ends.**++**Screenshot: the board when rules began.**++++**Screenshot: the board when rules ended.**++++### design++What this step does: ++**Clip: design, the PCB editor from 2026-11-06T15:00:26Z to 2026-11-06T15:00:38Z. Motion only: 0.2 min of real time, 8 s of it had something moving; the clock in the corner is the real elapsed time.**++<video width="100%" controls><source src="/blob/app/ghost-hand/docs/runs/ghost-hand-claude-opus-5-5-20261106-1434/design-1.mp4" type="video/mp4"></video>++**Contact sheet: nine frames spread through the design clip, what the camera saw.**++++**Screenshot: the board when design began.**++++**Screenshot: the board when design ended.**++++### test-plan++What this step does: Think through how this board will be tested once it is built and on the probing workcell: the measurements a careful engineer would take (rails, switch node, feedback, ripple, enable, LEDs), the net each one needs, and a probe spot for every one. The binary checks each planned measurement has a probe-able spot (a 0.5 mm round test point or an exposed pad the pogo tip can land on, within 50 mm of a ground machine contact, not under a part body) and adds a test point to the netlist for every gap.++**Clip: test-plan, the PCB editor from 2026-11-06T15:01:12Z to 2026-11-06T15:01:42Z. Motion only: 0.5 min of real time, 22 s of it had something moving; the clock in the corner is the real elapsed time.**++<video width="100%" controls><source src="/blob/app/ghost-hand/docs/runs/ghost-hand-claude-opus-5-5-20261106-1434/test-plan-1.mp4" type="video/mp4"></video>++**Contact sheet: nine frames spread through the test-plan clip, what the camera saw.**++++**Screenshot: the board when test-plan began.**++++**Screenshot: the board when test-plan ended.**++++### sourcing++What this step does: ++**Clip: sourcing, the PCB editor from 2026-11-06T15:02:32Z to 2026-11-06T15:04:28Z. Motion only: 1.9 min of real time, 84 s of it had something moving; the clock in the corner is the real elapsed time.**++<video width="100%" controls><source src="/blob/app/ghost-hand/docs/runs/ghost-hand-claude-opus-5-5-20261106-1434/sourcing-1.mp4" type="video/mp4"></video>++**Contact sheet: nine frames spread through the sourcing clip, what the camera saw.**++++**Screenshot: the board when sourcing began.**++++**Screenshot: the board when sourcing ended.**++++### parts++What this step does: The chosen parts on the Adom wiki: every BOM row with an MPN matched to its wiki component page (symbol, footprint, STEP); a missing page is made before going on. Each page is shown in a Hydrogen tab as it is confirmed, so the viewer sees the parts being picked.++**Clip: parts, still recording (started 2026-11-06T15:06:10Z); it appears here when the step ends.**++**Screenshot: the board when parts began.**++++**Screenshot: the board when parts ended.**++++### project-page++What this step does: Revision 1 of the board's project page before any EDA work: README (what the board is, its requirements) with the component table linking every part's wiki page, and a KiCad PCM repository of all the parts (an Adom Cloud Library exported and repackaged), so KiCad installs them in one go.++**Clip: project-page, still recording (started 2026-11-06T15:27:24Z); it appears here when the step ends.**++**Screenshot: the board when project-page began.**++++## Plan usage, the second cost line++Percent of each plan limit used, as the provider reports it, at the start of the run and at its end.++| Provider | Limit | At start | At end | Used by this run |+|---|---|---|---|---|+| antigravity | 3p week | 0.00 % | 0.00 % | 0.00 % |+| antigravity | week | 0.00 % | 0.00 % | 0.00 % |+| claude | Fable | 0.00 % | 0.00 % | 0.00 % |+| claude | week | 33.00 % | 35.00 % | 2.00 % |+| codex | week | 0.00 % | 0.00 % | 0.00 % |++*The limits are per account, not per run: every AI thread signed in as this user draws on the same numbers, so a run made while other threads were working shows their usage too. Read it as an upper bound unless this run was the only thread active.*++## Google Antigravity: tokens, quota and cost++0 model calls: 0 fresh input, 0 cached input and 0 output tokens. The run used **0.00 % of the weekly limit**, about **$0.00** of a $199.99/month plan.++| Step | Calls | Fresh input | Cached input | Output |+|---|---|---|---|---|++*Token counts are the difference of Antigravity's own per-call records (its conversation files) between step snapshots; exact when nothing else used Antigravity during the run.*++## Given back++0 issue(s) or PR(s) filed by this run's AI to make the tool better for every Adom user.++Adom processes PRs within minutes during business hours: a non-stop PR intake runs all day.
docs/runs/ghost-hand-claude-opus-5-5-20261106-1434/design-1-sheet.pngadded⋯ 1 unchanged line ⋯
docs/runs/ghost-hand-claude-opus-5-5-20261106-1434/design-1.mp4added⋯ 1 unchanged line ⋯
docs/runs/ghost-hand-claude-opus-5-5-20261106-1434/shot-design-1-end.pngadded⋯ 1 unchanged line ⋯
docs/runs/ghost-hand-claude-opus-5-5-20261106-1434/shot-design-1-start.pngadded⋯ 1 unchanged line ⋯
docs/runs/ghost-hand-claude-opus-5-5-20261106-1434/shot-parts-1-end.pngadded⋯ 1 unchanged line ⋯
docs/runs/ghost-hand-claude-opus-5-5-20261106-1434/shot-parts-1-start.pngadded⋯ 1 unchanged line ⋯
docs/runs/ghost-hand-claude-opus-5-5-20261106-1434/shot-project-page-1-start.pngadded⋯ 1 unchanged line ⋯
docs/runs/ghost-hand-claude-opus-5-5-20261106-1434/shot-rules-1-end.pngadded⋯ 1 unchanged line ⋯
docs/runs/ghost-hand-claude-opus-5-5-20261106-1434/shot-rules-1-start.pngadded⋯ 1 unchanged line ⋯
docs/runs/ghost-hand-claude-opus-5-5-20261106-1434/shot-sourcing-1-end.pngadded⋯ 1 unchanged line ⋯
docs/runs/ghost-hand-claude-opus-5-5-20261106-1434/shot-sourcing-1-start.pngadded⋯ 1 unchanged line ⋯
docs/runs/ghost-hand-claude-opus-5-5-20261106-1434/shot-test-plan-1-end.pngadded⋯ 1 unchanged line ⋯
docs/runs/ghost-hand-claude-opus-5-5-20261106-1434/shot-test-plan-1-start.pngadded⋯ 1 unchanged line ⋯
docs/runs/ghost-hand-claude-opus-5-5-20261106-1434/sourcing-1-sheet.pngadded⋯ 1 unchanged line ⋯
docs/runs/ghost-hand-claude-opus-5-5-20261106-1434/sourcing-1.mp4added⋯ 1 unchanged line ⋯
docs/runs/ghost-hand-claude-opus-5-5-20261106-1434/test-plan-1-sheet.pngadded⋯ 1 unchanged line ⋯
docs/runs/ghost-hand-claude-opus-5-5-20261106-1434/test-plan-1.mp4added⋯ 1 unchanged line ⋯