← Commit history
docs/runs/ghost-hand-claude-opus-5-5-20261106-1434/README.md+29−7
@@ -1,6 +1,6 @@ # AI Flow run: claude-opus-5-5 on board-0 -**Running**: step `project-page`, 52.6 min of AI time since the prompt (274.8 min on the wall clock). This page updates at every step change.+**Running**: step `library`, 57.7 min of AI time since the prompt (280.0 min on the wall clock). This page updates at every step change.  Prompt at 2026-11-06T14:34:00Z (UTC). Flow: board. Every number here is from the run's append-only ledger (run.jsonl). AI time is the time the AI was working on a prompt: from the human's prompt to the AI's done, with any gap over 15 min where no command ran (unobserved, not proven idle) cut out. @@ -10,8 +10,8 @@ One row per human prompt: the AI's time on it, unobserved gaps excluded by the h  | Session | Prompt at | Done at | AI time min | Unobserved gap min | What | |---|---|---|---|---|---|-| 1 | 2026-11-06T14:34:00Z | (open) | 52.6 | 222 | the first prompt |-| **all** | | | **52.6** | | |+| 1 | 2026-11-06T14:34:00Z | (open) | 57.7 | 222 | the first prompt |+| **all** | | | **57.7** | | |  ## Per step @@ -21,13 +21,14 @@ AI time only, the idle cut out. |---|---|---|---|---|---|---|---| | intake | 2.9 | 2.9 | 0.0 | 1 | 1 | 0 | 2.8 min | | components | 0.5 | 0.0 | 0.5 | 6 | 1 | 0 | 0.0 min |-| design | 43.1 | 0.0 | 43.1 | 4 | 1 | 0 | 0.0 min |+| design | 46.9 | 0.0 | 46.9 | 4 | 1 | 0 | 0.0 min |+| library | 0.0 | 0.0 | 0.0 | 1 | 1 | 0 | 0.0 min | | parts | 3.5 | 0.0 | 3.5 | 11 | 1 | 0 | 0.0 min |-| project-page | 0.5 | 0.0 | 0.5 | 7 | 2 | 1 | 0.0 min |+| project-page | 1.9 | 0.0 | 1.9 | 12 | 2 | 1 | 0.0 min | | rules | 0.4 | 0.3 | 0.1 | 4 | 1 | 0 | 0.3 min | | sourcing | 1.1 | 0.0 | 1.1 | 4 | 1 | 0 | 0.0 min | | test-plan | 0.7 | 0.0 | 0.7 | 2 | 1 | 0 | 0.0 min |-| **total** | **52.6** | **3.2** | **49.4** | | | | |+| **total** | **57.7** | **3.2** | **54.5** | | | | |  ## Returns to earlier steps @@ -46,6 +47,7 @@ AI time only, the idle cut out. - 2026-11-06T15:43:26Z clip-start:components-1 - 2026-11-06T19:08:18Z clip guard: the components clip ran 204 min, past its 10 min budget twice over; stopped by the guard - 2026-11-06T19:08:48Z clip-start:project-page-2+- 2026-11-06T19:13:56Z clip-start:library-1  ## Where the board stands @@ -170,12 +172,32 @@ What this step does: Audit wiki component identity, reusable CAD quality and red  What this step does: Revision 1 of the board's project page before any EDA work: README (what the board is, its requirements) with the component table linking every part's wiki page, and a KiCad PCM repository of all the parts (an Adom Cloud Library exported and repackaged), so KiCad installs them in one go. -**Clip: project-page, visit 2, still recording (started 2026-11-06T19:08:48Z); it appears here when the step ends.**+**Clip: project-page, visit 2, the PCB editor from 2026-11-06T19:08:48Z to 2026-11-06T19:11:28Z. Motion only: 2.5 min of real time, 106 s of it had something moving; the clock in the corner is the real elapsed time.**++<video width="100%" controls><source src="/blob/app/ghost-hand/docs/runs/ghost-hand-claude-opus-5-5-20261106-1434/project-page-2.mp4" type="video/mp4"></video>++**Contact sheet: nine frames spread through the project-page, visit 2 clip, what the camera saw.**++![nine frames of project-page, visit 2](/blob/app/ghost-hand/docs/runs/ghost-hand-claude-opus-5-5-20261106-1434/project-page-2-sheet.png)  **Screenshot: the board when project-page, visit 2 began.**  ![the board when project-page, visit 2 began](/blob/app/ghost-hand/docs/runs/ghost-hand-claude-opus-5-5-20261106-1434/shot-project-page-2-start.png) +**Screenshot: the board when project-page, visit 2 ended.**++![the board when project-page, visit 2 ended](/blob/app/ghost-hand/docs/runs/ghost-hand-claude-opus-5-5-20261106-1434/shot-project-page-2-end.png)++### library++What this step does: ++**Clip: library, still recording (started 2026-11-06T19:13:56Z); it appears here when the step ends.**++**Screenshot: the board when library began.**++![the board when library began](/blob/app/ghost-hand/docs/runs/ghost-hand-claude-opus-5-5-20261106-1434/shot-library-1-start.png)+ ## Plan usage, the second cost line  Percent of each plan limit used, as the provider reports it, at the start of the run and at its end.
docs/runs/ghost-hand-claude-opus-5-5-20261106-1434/project-page-2-sheet.pngadded
⋯ 1 unchanged line ⋯
docs/runs/ghost-hand-claude-opus-5-5-20261106-1434/project-page-2.mp4added
⋯ 1 unchanged line ⋯
docs/runs/ghost-hand-claude-opus-5-5-20261106-1434/shot-library-1-start.pngadded
⋯ 1 unchanged line ⋯
docs/runs/ghost-hand-claude-opus-5-5-20261106-1434/shot-project-page-2-end.pngadded
⋯ 1 unchanged line ⋯