# Ground continuity correction

The reviewed routing plan initially passed the geometric DRC comparison but left eleven open ground connections. A native top ground zone reduced this to seven. Native filled-copper geometry identified eight connected ground groups.

Five stitching vias reduced the seven opens to two. Rejected trial bridges crossed existing traces; they were never landed. The accepted candidate shortens a fan-tach branch, shifts its neighboring ground via from y=61.7 to y=61.9 mm, detours the latch signal to free a ground corridor, and adds a sixth stitching via at (114,80.4) mm.

`route-plan-ground-final-v5.json` passes the native AIFlow gate with zero new DRC errors, zero inherited errors and zero unconnected items. Project rules travel with the candidate. This is candidate evidence; final native landing, saved-board verification, fitted visibility, current capacity, USB electrical review and thermal analysis remain separate gates.

The conservative local escape search is only an experiment and did not find a path. Its output is not accepted native routing. Native candidate fills are disposable snapshots; no failed trial modified the live editor.
