project
Adom Custom Electronic Load
Public Made by Adomby adom
Two-layer digitally controlled electronic-load prototype. Compact R11 is under active electrical, cooling and probe-access review; not a manufacturing release.
← Commit history
docs/status.md+6@@ -1,3 +1,9 @@+## Latest: native net review and temperature measurement margin++Take 92 records six power nets in native KiCad on the unchanged v85 revision. Inventory: 92 raw takes, 36 reviewed excerpts, 32 storyboard candidates. The actual STM32 tach adapter passes fake-HAL tests, and the full host suite passes. The sensor screen now names the correct 300 mm candidate; its indicated 55 C cutoff can correspond to approximately 56.19 C under the limited static tolerance screen. See [trip budget](sensor-trip-budget.md). Output remains locked; physical calibration and timing remain unqualified.++The timeline is open in Hydrogen at Thermal 13/19. Fields PR11 remains open; shared Fields 0.7.8 was not replaced. Minimum finished surface and barrel copper remain a requested fabrication input. [Current completion plan](completion-plan.md).+ ## Latest review: insulating stack and fan shutdown The AlN/PEEK nominal stack is published and take 91 is reviewed: 91 raw takes, 35 reviewed excerpts, 31 storyboard candidates. The combined tach/policy test passes 240 synthetic scheduler cases. Hardware output stays locked; physical shutdown and cooling remain unqualified. Dashboard remains Thermal 13/19, with the latest caption verified live. Finished copper clarification remains pending. See [fan timing review](fan-shutdown-review.md) and [active completion plan](completion-plan.md).