← Commit history

Prepare silent cost and qualification card for editorial review

John Lauer ·dd314324d0 · ·parent 0e30ebb
5 files changed +22−1
videos/final-cost-card-SILENT-DRAFT.mp4added
⋯ 1 unchanged line ⋯
videos/final-cost-card.pngadded
⋯ 1 unchanged line ⋯
videos/final-cost-card.txtadded+11
@@ -0,0 +1,11 @@+ADOM ELECTRONIC LOAD  |  PROTOTYPE DESIGN++Board design checks and export review pass+5 W initial operating envelope++$102.96 partial first-prototype amounts+Dated listings + partial inventory allocation+Not a complete build cost or supplier quote++Mechanical release and physical qualification remain open+Manufacturing, labor, shipping and other parts are additional
videos/final-stage-candidates.json+10
@@ -23,6 +23,16 @@       "source": "aiflow/run/window-47712810-20261012-135838.mp4",       "scope": "Recorded native saved-board walkthrough; not routing footage or physical hardware",       "approval": "pending"+    },+    {+      "id": "final-cost-limits",+      "file": "videos/final-cost-card-SILENT-DRAFT.mp4",+      "durationSeconds": 8,+      "source": "Authored title card, not screen recording",+      "review": "Rendered image inspected; text fits; editorial approval pending",+      "narration": "The first prototype still has incomplete costs and needs mechanical release and physical qualification.",+      "approval": "pending",+      "audio": "none; TTS unavailable"     }   ] }
videos/four-minute-edit-plan.json+1−1
@@ -3,7 +3,7 @@   "selectedCount": 35,   "selectedDurationSeconds": 256.74933300000004,   "brandStingsAllowanceSeconds": 8,-  "futureFinishAndCostAllowanceSeconds": 35,+  "futureFinishAndCostAllowanceSeconds": 33.533333,   "plannedMaximumSeconds": 298.28266600000006,   "targetSeconds": [     240,