← Commit history
docs/runs/board-codex-20261007-1749/README.md+36−12
@@ -1,6 +1,6 @@ # AI Flow run: codex on board-0 -**Running**: step `current`, 1575.8 min of AI time since the prompt (6211.3 min on the wall clock). This page updates at every step change.+**Running**: step `thermal`, 1577.1 min of AI time since the prompt (6212.6 min on the wall clock). This page updates at every step change.  Prompt at 2026-10-07T17:49:14Z (UTC). Flow: board. Every number here is from the run's append-only ledger (run.jsonl). AI time is the time the AI was working on a prompt: from the human's prompt to the AI's done, with any gap over 15 min where no command ran (unobserved, not proven idle) cut out. @@ -22,8 +22,8 @@ One row per human prompt: the AI's time on it, unobserved gaps excluded by the h | 10 | 2026-10-09T18:12:40Z | (open) | 10.1 | 99 | Resume electronic-load completion: inspect native board, land reviewed diode thermal vias  | | 11 | 2026-10-09T20:02:16Z | (open) | 220.9 | 861 | Continue board 18 to completion; resolve package-mounted cooling and thermal solver suppor | | 12 | 2026-10-10T14:04:14Z | (open) | 202.2 | 312 | Continue electronic-load engineering and recorded workflow; magnetic-field question withdr |-| 13 | 2026-10-10T22:38:10Z | (open) | 646.8 | 956 | Continue to the finish line; resolve supported cooling design and remaining deliverables,  |-| **all** | | | **1575.8** | | |+| 13 | 2026-10-10T22:38:10Z | (open) | 648.1 | 956 | Continue to the finish line; resolve supported cooling design and remaining deliverables,  |+| **all** | | | **1577.1** | | |  ## Per step @@ -35,17 +35,17 @@ AI time only, the idle cut out. | placement | 9.5 | 0.0 | 9.5 | 31 | 5 | 3 | 0.0 min | | routing | 59.4 | 0.0 | 59.4 | 69 | 6 | 1 | 0.0 min | | pours | 5.0 | 0.0 | 5.0 | 18 | 2 | 0 | 0.0 min |-| current | 77.8 | 0.0 | 77.8 | 121 | 2 | 0 | 0.0 min |-| thermal | 54.8 | 0.0 | 54.8 | 258 | 1 | 0 | 0.0 min |+| current | 78.1 | 0.0 | 78.1 | 123 | 2 | 0 | 0.0 min |+| thermal | 54.8 | 0.0 | 54.8 | 259 | 2 | 0 | 0.0 min | | components | 66.3 | 0.0 | 66.3 | 386 | 2 | 1 | 0.0 min | | design | 2.5 | 0.0 | 2.5 | 11 | 1 | 0 | 0.0 min | | libraries | 3.8 | 0.0 | 3.8 | 18 | 2 | 0 | 0.0 min | | models | 15.3 | 0.0 | 15.3 | 30 | 2 | 0 | 0.0 min | | outline | 0.4 | 0.0 | 0.4 | 4 | 2 | 0 | 0.0 min |-| rules | 1250.5 | 0.0 | 1250.5 | 14 | 1 | 0 | 0.0 min |+| rules | 1251.5 | 0.0 | 1251.5 | 14 | 1 | 0 | 0.0 min | | test-plan | 0.7 | 0.0 | 0.7 | 10 | 2 | 0 | 0.0 min | | thermal-vias | 27.3 | 0.0 | 27.3 | 180 | 5 | 0 | 0.0 min |-| **total** | **1575.8** | **0.3** | **1575.5** | | | | |+| **total** | **1577.1** | **0.3** | **1576.8** | | | | |  ## Returns to earlier steps @@ -177,6 +177,8 @@ AI time only, the idle cut out. - 2026-10-12T01:18:22Z clip-start:pours-2 - 2026-10-12T01:19:20Z clip-start:outline-2 - 2026-10-12T01:20:26Z clip-start:current-2+- 2026-10-12T01:20:56Z artifact analysis-image for current-2: Board32 current acceptance: six nets pass at assumed 35 µm surface copper and 25 µm plating. Unclipped peak approximately 58.75 A/mm²; thermal qualification remains open.+- 2026-10-12T01:21:44Z clip-start:thermal-2  ## Where the board stands @@ -649,10 +651,6 @@ What this step does: Check native board model resolution and inspect the selecte  ![the board when models, visit 2 began](/blob/app/adom-custom-electronic-load/docs/runs/board-codex-20261007-1749/shot-models-2-start.png) -**The AI's drawing: Board32 current screen: six loaded nets pass at assumed 35 µm surface copper. Display clipped; quantitative peaks unclipped. Fabricator and hardware validation pending.**--![Board32 current screen: six loaded nets pass at assumed 35 µm surface copper. Display clipped; quantitative peaks unclipped. Fabricator and hardware validation pending.](/blob/app/adom-custom-electronic-load/docs/runs/board-codex-20261007-1749/models-2-analysis-image-0.png)- ### test-plan, visit 2  What this step does: Think through how this board will be tested once it is built and on the probing workcell: the measurements a careful engineer would take (rails, switch node, feedback, ripple, enable, LEDs), the net each one needs, and a probe spot for every one. The binary checks each planned measurement has a probe-able spot (a 0.5 mm round test point or an exposed pad the pogo tip can land on, within 50 mm of a ground machine contact, not under a part body) and adds a test point to the netlist for every gap.@@ -779,12 +777,38 @@ What this step does: IPC-2221 on every loaded net, pour and via capacity, the sa  Why the AI came back here: Saved pours verified and rounded outline retained; record fresh same-input current acceptance -**Clip: current, visit 2, still recording (started 2026-10-12T01:20:26Z); it appears here when the step ends.**+**Clip: current, visit 2, the PCB editor from 2026-10-12T01:20:26Z to 2026-10-12T01:21:35Z. Motion only: 1.1 min of real time, 0 s of it had something moving; the clock in the corner is the real elapsed time.**++<video width="100%" controls><source src="/blob/app/adom-custom-electronic-load/docs/runs/board-codex-20261007-1749/current-2.mp4" type="video/mp4"></video>++**Contact sheet: nine frames spread through the current, visit 2 clip, what the camera saw.**++![nine frames of current, visit 2](/blob/app/adom-custom-electronic-load/docs/runs/board-codex-20261007-1749/current-2-sheet.png)  **Screenshot: the board when current, visit 2 began.**  ![the board when current, visit 2 began](/blob/app/adom-custom-electronic-load/docs/runs/board-codex-20261007-1749/shot-current-2-start.png) +**Screenshot: the board when current, visit 2 ended.**++![the board when current, visit 2 ended](/blob/app/adom-custom-electronic-load/docs/runs/board-codex-20261007-1749/shot-current-2-end.png)++**The AI's drawing: Board32 current acceptance: six nets pass at assumed 35 µm surface copper and 25 µm plating. Unclipped peak approximately 58.75 A/mm²; thermal qualification remains open.**++![Board32 current acceptance: six nets pass at assumed 35 µm surface copper and 25 µm plating. Unclipped peak approximately 58.75 A/mm²; thermal qualification remains open.](/blob/app/adom-custom-electronic-load/docs/runs/board-codex-20261007-1749/current-2-analysis-image-0.png)++### thermal, visit 2++What this step does: copper and vias at every hot tab against the rise budget; then the AI's own temperature rise drawing and a walkthrough of the pours it judged++Why the AI came back here: Current screen passes on Board32; retain full heat and case ceiling while reviewing physical cooling interface++**Clip: thermal, visit 2, still recording (started 2026-10-12T01:21:44Z); it appears here when the step ends.**++**Screenshot: the board when thermal, visit 2 began.**++![the board when thermal, visit 2 began](/blob/app/adom-custom-electronic-load/docs/runs/board-codex-20261007-1749/shot-thermal-2-start.png)+ ## Plan usage, the second cost line  Percent of each plan limit used, as the provider reports it, at the start of the run and at its end.
docs/runs/board-codex-20261007-1749/current-2-analysis-image-0.pngadded
⋯ 1 unchanged line ⋯
docs/runs/board-codex-20261007-1749/current-2-sheet.pngadded
⋯ 1 unchanged line ⋯
docs/runs/board-codex-20261007-1749/current-2.mp4added
⋯ 1 unchanged line ⋯
docs/runs/board-codex-20261007-1749/shot-current-2-end.pngadded
⋯ 1 unchanged line ⋯
docs/runs/board-codex-20261007-1749/shot-thermal-2-start.pngadded
⋯ 1 unchanged line ⋯