project
Adom Custom Electronic Load
Public Made by Adomby adom
Two-layer digitally controlled electronic-load prototype. Compact R11 is under active electrical, cooling and probe-access review; not a manufacturing release.
← Commit history
aiflow run board-codex-20261007-1749: thermal-vias
5 files changed
+31−8
docs/runs/board-codex-20261007-1749/README.md+31−8@@ -1,6 +1,6 @@ # AI Flow run: codex on board-0 -**Running**: step `routing`, 1571.3 min of AI time since the prompt (6206.8 min on the wall clock). This page updates at every step change.+**Running**: step `thermal-vias`, 1572.2 min of AI time since the prompt (6207.7 min on the wall clock). This page updates at every step change. Prompt at 2026-10-07T17:49:14Z (UTC). Flow: board. Every number here is from the run's append-only ledger (run.jsonl). AI time is the time the AI was working on a prompt: from the human's prompt to the AI's done, with any gap over 15 min where no command ran (unobserved, not proven idle) cut out. @@ -22,8 +22,8 @@ One row per human prompt: the AI's time on it, unobserved gaps excluded by the h | 10 | 2026-10-09T18:12:40Z | (open) | 10.1 | 99 | Resume electronic-load completion: inspect native board, land reviewed diode thermal vias | | 11 | 2026-10-09T20:02:16Z | (open) | 220.9 | 861 | Continue board 18 to completion; resolve package-mounted cooling and thermal solver suppor | | 12 | 2026-10-10T14:04:14Z | (open) | 202.2 | 312 | Continue electronic-load engineering and recorded workflow; magnetic-field question withdr |-| 13 | 2026-10-10T22:38:10Z | (open) | 642.3 | 956 | Continue to the finish line; resolve supported cooling design and remaining deliverables, |-| **all** | | | **1571.3** | | |+| 13 | 2026-10-10T22:38:10Z | (open) | 643.2 | 956 | Continue to the finish line; resolve supported cooling design and remaining deliverables, |+| **all** | | | **1572.2** | | | ## Per step @@ -33,7 +33,7 @@ AI time only, the idle cut out. |---|---|---|---|---|---|---|---| | intake | 2.6 | 0.3 | 2.2 | 3 | 1 | 0 | 0.3 min | | placement | 9.5 | 0.0 | 9.5 | 31 | 5 | 3 | 0.0 min |-| routing | 59.2 | 0.0 | 59.2 | 68 | 6 | 1 | 0.0 min |+| routing | 59.4 | 0.0 | 59.4 | 69 | 6 | 1 | 0.0 min | | pours | 4.7 | 0.0 | 4.7 | 16 | 1 | 0 | 0.0 min | | current | 77.8 | 0.0 | 77.8 | 120 | 1 | 0 | 0.0 min | | thermal | 54.8 | 0.0 | 54.8 | 258 | 1 | 0 | 0.0 min |@@ -42,10 +42,10 @@ AI time only, the idle cut out. | libraries | 3.8 | 0.0 | 3.8 | 18 | 2 | 0 | 0.0 min | | models | 15.3 | 0.0 | 15.3 | 30 | 2 | 0 | 0.0 min | | outline | 0.1 | 0.0 | 0.1 | 2 | 1 | 0 | 0.0 min |-| rules | 1247.1 | 0.0 | 1247.1 | 14 | 1 | 0 | 0.0 min |+| rules | 1247.9 | 0.0 | 1247.9 | 14 | 1 | 0 | 0.0 min | | test-plan | 0.7 | 0.0 | 0.7 | 10 | 2 | 0 | 0.0 min |-| thermal-vias | 26.9 | 0.0 | 26.9 | 177 | 4 | 0 | 0.0 min |-| **total** | **1571.3** | **0.3** | **1571.0** | | | | |+| thermal-vias | 26.9 | 0.0 | 26.9 | 178 | 5 | 0 | 0.0 min |+| **total** | **1572.2** | **0.3** | **1571.9** | | | | | ## Returns to earlier steps @@ -173,6 +173,7 @@ AI time only, the idle cut out. - 2026-10-12T01:14:46Z clip-start:placement-5 - 2026-10-12T01:15:29Z capture-stop - 2026-10-12T01:15:58Z clip-start:routing-6+- 2026-10-12T01:16:49Z clip-start:thermal-vias-5 ## Where the board stands @@ -687,12 +688,34 @@ What this step does: route to 100 percent with the spec's rules, gate with KiCad Why the AI came back here: Adopted Board32 copper is already routed; verify existing routing and retain it -**Clip: routing, visit 6, still recording (started 2026-10-12T01:15:58Z); it appears here when the step ends.**+**Clip: routing, visit 6, the PCB editor from 2026-10-12T01:15:58Z to 2026-10-12T01:16:41Z. Motion only: 0.7 min of real time, 0 s of it had something moving; the clock in the corner is the real elapsed time.**++<video width="100%" controls><source src="/blob/app/adom-custom-electronic-load/docs/runs/board-codex-20261007-1749/routing-6.mp4" type="video/mp4"></video>++**Contact sheet: nine frames spread through the routing, visit 6 clip, what the camera saw.**++ **Screenshot: the board when routing, visit 6 began.**  +**Screenshot: the board when routing, visit 6 ended.**++++### thermal-vias, visit 5++What this step does: Heatsink vias where the heat is: for every part that dissipates real power (the regulator, the inductor, the catch diode, the FETs), an array of vias in its thermal pad or the copper it dumps heat into, stitched to the ground or the plane on the other side, sized and counted from its dissipation; the AI reviews the plan and the binary lands it.++Why the AI came back here: Existing routing retained; check local thermal paths without claiming heatsink qualification++**Clip: thermal-vias, visit 5, still recording (started 2026-10-12T01:16:49Z); it appears here when the step ends.**++**Screenshot: the board when thermal-vias, visit 5 began.**+++ ## Plan usage, the second cost line Percent of each plan limit used, as the provider reports it, at the start of the run and at its end.
docs/runs/board-codex-20261007-1749/routing-6-sheet.pngadded⋯ 1 unchanged line ⋯
docs/runs/board-codex-20261007-1749/routing-6.mp4added⋯ 1 unchanged line ⋯
docs/runs/board-codex-20261007-1749/shot-routing-6-end.pngadded⋯ 1 unchanged line ⋯
docs/runs/board-codex-20261007-1749/shot-thermal-vias-5-start.pngadded⋯ 1 unchanged line ⋯