← Commit history

Withdraw invalid large-pin probing evidence and document mating correction

John Lauer ·753b7dc681 · ·parent 8294854
2 files changed +32−27
docs/probe-mating-correction.mdadded+3
@@ -0,0 +1,3 @@+# Probe ground compatibility correction++User review caught a medium probe pin inserted into a large corner MP1. Prior all-six-pass evidence is invalid. Four large mounting pins must remain large for scaffold use; the probe must use a separate free medium GND contact. Native scan also incorrectly treated J10 (NTC connector) and J11 (SWD header) as machine contacts based on drill size. These are excluded by the correction. J7 is the existing medium GND candidate; reach and collision revalidation remain required.
docs/remote-service-clips.md+29−27
@@ -1,27 +1,29 @@-# Electronic-load design progression
-
-## Latest: probing the revised board (simulated)
-
-The ground pincer seats its pin and the probe visits rail test points, then the relocated BOOST_SW pad TP16. Travel is accelerated and waiting is cut. Adom TTS narration; selectable captions. The current native board passes DRC with zero violations/opens and all six nominal probing stages, including coverage with no missing or proposed landings. These checks do not qualify electrical behavior or physical manufacturing tolerances.
-
-::adom-video{video="/adom/adom-custom-electronic-load/render/videos/remote-service/probe-tp16-v1.mp4" poster="/adom/adom-custom-electronic-load/render/videos/remote-service/probe-tp16-v1.jpg" captions="/adom/adom-custom-electronic-load/render/videos/remote-service/probe-tp16-v1.vtt"}
-
-The runtime batches rigid CAD faces for display only. The collision solver retains the complete unbatched engineering model. Browser/CLI tether-solver equivalence and fan motion-state integration remain separate open work; this clip is not proof of those features.
-
-# Sensor service access: matched before and after
-
-These replacement clips focus on the actual changed area, with the same camera path, an amber location marker, faster movement, and Adom TTS narration without long silent pauses. Captions remain optional player tracks. The prior wide silent tours have been replaced.
-
-## Before
-
-Before, the circuit board blocks access to the temperature sensor screw. Look underneath: there is no service opening here.
-
-::adom-video{video="/adom/adom-custom-electronic-load/render/videos/remote-service/before-matched.mp4" poster="/adom/adom-custom-electronic-load/render/videos/remote-service/before-matched.jpg" captions="/adom/adom-custom-electronic-load/render/videos/remote-service/before-matched.vtt"}
-
-## After
-
-After, the sensor moves aside and a six point eight millimeter opening gives straight access from below. The cooler can stay assembled.
-
-::adom-video{video="/adom/adom-custom-electronic-load/render/videos/remote-service/after-matched.mp4" poster="/adom/adom-custom-electronic-load/render/videos/remote-service/after-matched.jpg" captions="/adom/adom-custom-electronic-load/render/videos/remote-service/after-matched.vtt"}
-
-The marker identifies the revised access-hole position in both models. The sensor also moves 8 mm laterally and 0.5 mm longitudinally. These are retrospective geometry reviews, not footage of the original CAD editing. Service is planned with the molecule removed from the scaffold; physical tool, extraction and assembly qualification remain pending.
+> **Correction, 2026-10-16:** The TP16 probing clip below shows an invalid medium probe-pin connection to large MP1. Its previous probing-pass claim is withdrawn. Retained as design-history footage, not valid test-access evidence. A size-compatibility fix and corrected replay are in progress.++# Electronic-load design progression++## Latest: probing the revised board (simulated)++The ground pincer seats its pin and the probe visits rail test points, then the relocated BOOST_SW pad TP16. Travel is accelerated and waiting is cut. Adom TTS narration; selectable captions. The current native board passes DRC with zero violations/opens and all six nominal probing stages, including coverage with no missing or proposed landings. These checks do not qualify electrical behavior or physical manufacturing tolerances.++::adom-video{video="/adom/adom-custom-electronic-load/render/videos/remote-service/probe-tp16-v1.mp4" poster="/adom/adom-custom-electronic-load/render/videos/remote-service/probe-tp16-v1.jpg" captions="/adom/adom-custom-electronic-load/render/videos/remote-service/probe-tp16-v1.vtt"}++The runtime batches rigid CAD faces for display only. The collision solver retains the complete unbatched engineering model. Browser/CLI tether-solver equivalence and fan motion-state integration remain separate open work; this clip is not proof of those features.++# Sensor service access: matched before and after++These replacement clips focus on the actual changed area, with the same camera path, an amber location marker, faster movement, and Adom TTS narration without long silent pauses. Captions remain optional player tracks. The prior wide silent tours have been replaced.++## Before++Before, the circuit board blocks access to the temperature sensor screw. Look underneath: there is no service opening here.++::adom-video{video="/adom/adom-custom-electronic-load/render/videos/remote-service/before-matched.mp4" poster="/adom/adom-custom-electronic-load/render/videos/remote-service/before-matched.jpg" captions="/adom/adom-custom-electronic-load/render/videos/remote-service/before-matched.vtt"}++## After++After, the sensor moves aside and a six point eight millimeter opening gives straight access from below. The cooler can stay assembled.++::adom-video{video="/adom/adom-custom-electronic-load/render/videos/remote-service/after-matched.mp4" poster="/adom/adom-custom-electronic-load/render/videos/remote-service/after-matched.jpg" captions="/adom/adom-custom-electronic-load/render/videos/remote-service/after-matched.vtt"}++The marker identifies the revised access-hole position in both models. The sensor also moves 8 mm laterally and 0.5 mm longitudinally. These are retrospective geometry reviews, not footage of the original CAD editing. Service is planned with the molecule removed from the scaffold; physical tool, extraction and assembly qualification remain pending.