← Commit history

Show Board34 carrier clearance revision and Q1 contact review

John Lauer ·733f9582ac · ·parent 4c85256
4 files changed +9
docs/build-clips.md+9
@@ -318,3 +318,12 @@ An18second native Hydrogen recording, cropped to this project's workcell panel. <video src="docs/clips/board34-simulated-fan.mp4" poster="docs/clips/board34-simulated-fan-poster.jpg" controls preload="metadata"></video>  ![Reviewed workcell replay frames](docs/clips/board34-simulated-fan-sheet.jpg)+++### Board34 rear-support clearance revision++The R6 carrier moves support away from the front probe contacts, clears the large corner pin and raises the beam above U7. The exact-board fitted-body screen reports no unexpected intersections. Full motion, tether and cooling acceptance remain open. This is a nominal CAD inspection, not physical qualification. Native Pup recording, 2x playback; recorder timestamp-repair caveat retained in the local inventory.++<video controls preload="metadata" poster="docs/clips/board34-rear-carrier-poster.jpg" src="docs/clips/board34-rear-carrier-2x.mp4"></video>++![Rear carrier and Q1 contact inspection](docs/clips/board34-rear-carrier-sheet.jpg)
docs/clips/board34-rear-carrier-2x.mp4added
⋯ 1 unchanged line ⋯
docs/clips/board34-rear-carrier-poster.jpgadded
⋯ 1 unchanged line ⋯
docs/clips/board34-rear-carrier-sheet.jpgadded
⋯ 1 unchanged line ⋯