← Commit history

aiflow run board-codex-20261007-1749: pours

John Lauer ·71b293f951 ·18d ago ·parent 8a285d0
1 file changed +29−10
docs/runs/board-codex-20261007-1749/README.md+29−10
@@ -1,6 +1,6 @@ # AI Flow run: codex on board-0 -**Running**: step `thermal-vias`, 470.8 min of AI time since the prompt (2810.1 min on the wall clock). This page updates at every step change.+**Running**: step `pours`, 558.2 min of AI time since the prompt (3237.7 min on the wall clock). This page updates at every step change.  Prompt at 2026-10-07T17:49:14Z (UTC). Flow: board. Every number here is from the run's append-only ledger (run.jsonl). AI time is the time the AI was working on a prompt: from the human's prompt to the AI's done, with any gap over 15 min where no command ran (unobserved, not proven idle) cut out. @@ -18,8 +18,10 @@ One row per human prompt: the AI's time on it, unobserved gaps excluded by the h | 6 | 2026-10-09T10:28:54Z | (open) | 13.9 | 35 | Continue electronic-load engineering through AIFlow, with real dashboard progress and clip | | 7 | 2026-10-09T11:18:03Z | (open) | 4.6 | 69 | Keep going on AIFlow: continue electronic-load engineering and recorded board work. | | 8 | 2026-10-09T12:31:28Z | (open) | 24.5 | 31 | Resume the electronic load through all AIFlow design gates after dashboard corrections; co |-| 9 | 2026-10-09T13:26:48Z | (open) | 173.1 | 19 | Continue original electronic-load objective. Compact 5 W prototype is the working basis fr |-| **all** | | | **470.8** | | |+| 9 | 2026-10-09T13:26:48Z | (open) | 198.1 | 88 | Continue original electronic-load objective. Compact 5 W prototype is the working basis fr |+| 10 | 2026-10-09T18:12:40Z | (open) | 10.1 | 99 | Resume electronic-load completion: inspect native board, land reviewed diode thermal vias  |+| 11 | 2026-10-09T20:02:16Z | (open) | 52.3 | 172 | Continue board 18 to completion; resolve package-mounted cooling and thermal solver suppor |+| **all** | | | **558.2** | | |  ## Per step @@ -30,14 +32,15 @@ AI time only, the idle cut out. | intake | 2.6 | 0.3 | 2.2 | 3 | 1 | 0 | 0.3 min | | placement | 9.0 | 0.0 | 9.0 | 28 | 4 | 3 | 0.0 min | | routing | 59.2 | 0.0 | 59.2 | 67 | 5 | 1 | 0.0 min |+| pours | 0.0 | 0.0 | 0.0 | 1 | 1 | 0 | 0.0 min | | components | 11.9 | 0.0 | 11.9 | 28 | 1 | 0 | 0.0 min | | design | 2.5 | 0.0 | 2.5 | 11 | 1 | 0 | 0.0 min | | libraries | 1.4 | 0.0 | 1.4 | 6 | 1 | 0 | 0.0 min | | models | 0.6 | 0.0 | 0.6 | 4 | 1 | 0 | 0.0 min |-| rules | 364.1 | 0.0 | 364.1 | 14 | 1 | 0 | 0.0 min |+| rules | 444.0 | 0.0 | 444.0 | 14 | 1 | 0 | 0.0 min | | test-plan | 0.1 | 0.0 | 0.1 | 5 | 1 | 0 | 0.0 min |-| thermal-vias | 19.5 | 0.0 | 19.5 | 121 | 4 | 0 | 0.0 min |-| **total** | **470.8** | **0.3** | **470.5** | | | | |+| thermal-vias | 26.9 | 0.0 | 26.9 | 177 | 4 | 0 | 0.0 min |+| **total** | **558.1** | **0.3** | **557.8** | | | | |  ## Returns to earlier steps @@ -78,6 +81,14 @@ AI time only, the idle cut out. - 2026-10-09T15:47:39Z capture-stop - 2026-10-09T16:06:04Z capture-start - 2026-10-09T16:07:11Z capture-stop+- 2026-10-09T16:42:14Z artifact analysis-image for thermal-vias-4: Fan component 0.2.1: quiet state cycle and explicit added Adom connector harness. Nominal geometry; physical qualification pending.+- 2026-10-09T18:22:48Z artifact analysis-image for thermal-vias-4: Recorded native landing of nine D1 thermal vias. Saved-board DRC: zero errors and opens; cooling qualification pending.+- 2026-10-09T20:06:14Z artifact analysis-image for thermal-vias-4: Unqualified package-path sensitivity: 5 W, 40 C ambient, unchanged 55 C trip. Ducted flow scenarios are not measured fan performance.+- 2026-10-09T20:13:35Z artifact analysis-image for thermal-vias-4: Unqualified package-cooling sensitivity at 5 W and 40 C ambient; 55 C trip retained. Ducted airflow scenarios are not measured fan performance.+- 2026-10-09T20:25:34Z artifact analysis-image for thermal-vias-4: Board 18 stock-sink envelope candidate. 91 fitted-model boxes and probe circles clear; exact contact, hardware, cradle, plugs and airflow remain unresolved.+- 2026-10-09T20:48:19Z artifact test-report for thermal-vias-4: Output-locked I2C adapter and conversion-age cache: fake-HAL/C tests plus 25 Python tests; physical I2C unverified+- 2026-10-09T20:51:36Z artifact test-report for thermal-vias-4: Nominal ADC conversion tests pass against Vishay table points; MCU build output-locked; calibration and physical acquisition unverified+- 2026-10-09T20:53:47Z artifact test-report for thermal-vias-4: ADC/I2C adapter fault-injection and nominal-conversion host tests pass; output locked, physical operation unverified  ## Where the board stands @@ -349,23 +360,31 @@ What this step does: route to 100 percent with the spec's rules, gate with KiCad  ![the board when routing, visit 5 began](/blob/app/adom-custom-electronic-load/docs/runs/board-codex-20261007-1749/shot-routing-5-start.png) +### pours++What this step does: pour every net the spec names, keepouts along Kelvin taps, thermal and stitching vias, land, measure the copper kept++**Clip: pours, still recording (started 2026-10-09T23:46:53Z); it appears here when the step ends.**+ ## Plan usage, the second cost line  Percent of each plan limit used, as the provider reports it, at the start of the run and at its end.  | Provider | Limit | At start | At end | Used by this run | |---|---|---|---|---|-| claude | 5h | 17 % | 3 % | -14.0 % |+| claude | 5h | 17 % | 5 % | -12.0 % | | claude | Fable | 0 % | 3 % | 3.0 % |-| claude | week | 54 % | 69 % | 15.0 % |-| codex | week | 2 % | 32 % | 30.0 % |+| claude | week | 54 % | 71 % | 17.0 % |+| codex | week | 2 % | 37 % | 35.0 % |  *The limits are per account, not per run: every AI thread signed in as this user draws on the same numbers, so a run made while other threads were working shows their usage too. Read it as an upper bound unless this run was the only thread active.*  ## Given back -1 issue(s) or PR(s) filed by this run's AI to make the tool better for every Adom user:+3 issue(s) or PR(s) filed by this run's AI to make the tool better for every Adom user:  - pr https://wiki.adom.inc/adom/adom-aiflow/prs/32: Browser access classifier and required off-board component wiki coverage; tested candidate, awaiting owner merge and release+- issue https://wiki.adom.inc/adom/adom-aiflow/issues/40: Stale pour plan hid diode cooling-via candidates after a native zone relocation; request input freshness checks.+- issue https://wiki.adom.inc/adom/component-hero/issues/1: Mechanical-only fan mounting footprint has no copper pads; generator needs a genuine mechanical hero path.  Adom processes PRs within minutes during business hours: a non-stop PR intake runs all day.