← Commit history
Remove superseded probing-pass wording after incompatible ground mate was found
1 file changed
+2−2
docs/remote-service-clips.md+2−2@@ -2,9 +2,9 @@ # Electronic-load design progression -## Latest: probing the revised board (simulated)+## Superseded probing replay — invalid ground-pin mate -The ground pincer seats its pin and the probe visits rail test points, then the relocated BOOST_SW pad TP16. Travel is accelerated and waiting is cut. Adom TTS narration; selectable captions. The current native board passes DRC with zero violations/opens and all six nominal probing stages, including coverage with no missing or proposed landings. These checks do not qualify electrical behavior or physical manufacturing tolerances.+The ground pincer seats its pin and the probe visits rail test points, then the relocated BOOST_SW pad TP16. Travel is accelerated and waiting is cut. Adom TTS narration; selectable captions. The former six-stage pass is withdrawn because its medium-to-large ground-pin mate was invalid. Current rework has passed native DRC but still fails assembled collision/tether checks. This historical clip does not qualify test access, electrical behavior or manufacturing tolerances. ::adom-video{video="/adom/adom-custom-electronic-load/render/videos/remote-service/probe-tp16-v1.mp4" poster="/adom/adom-custom-electronic-load/render/videos/remote-service/probe-tp16-v1.jpg" captions="/adom/adom-custom-electronic-load/render/videos/remote-service/probe-tp16-v1.vtt"}