project
Adom Custom Electronic Load
Public Made by Adomby adom
Two-layer digitally controlled electronic-load prototype. Compact R11 is under active electrical, cooling and probe-access review; not a manufacturing release.
← Commit history
aiflow run board-codex-20261007-1749: pours
5 files changed
+31−8
docs/runs/board-codex-20261007-1749/README.md+31−8@@ -1,6 +1,6 @@ # AI Flow run: codex on board-0 -**Running**: step `thermal-vias`, 1572.2 min of AI time since the prompt (6207.7 min on the wall clock). This page updates at every step change.+**Running**: step `pours`, 1573.8 min of AI time since the prompt (6209.2 min on the wall clock). This page updates at every step change. Prompt at 2026-10-07T17:49:14Z (UTC). Flow: board. Every number here is from the run's append-only ledger (run.jsonl). AI time is the time the AI was working on a prompt: from the human's prompt to the AI's done, with any gap over 15 min where no command ran (unobserved, not proven idle) cut out. @@ -22,8 +22,8 @@ One row per human prompt: the AI's time on it, unobserved gaps excluded by the h | 10 | 2026-10-09T18:12:40Z | (open) | 10.1 | 99 | Resume electronic-load completion: inspect native board, land reviewed diode thermal vias | | 11 | 2026-10-09T20:02:16Z | (open) | 220.9 | 861 | Continue board 18 to completion; resolve package-mounted cooling and thermal solver suppor | | 12 | 2026-10-10T14:04:14Z | (open) | 202.2 | 312 | Continue electronic-load engineering and recorded workflow; magnetic-field question withdr |-| 13 | 2026-10-10T22:38:10Z | (open) | 643.2 | 956 | Continue to the finish line; resolve supported cooling design and remaining deliverables, |-| **all** | | | **1572.2** | | |+| 13 | 2026-10-10T22:38:10Z | (open) | 644.8 | 956 | Continue to the finish line; resolve supported cooling design and remaining deliverables, |+| **all** | | | **1573.8** | | | ## Per step @@ -34,7 +34,7 @@ AI time only, the idle cut out. | intake | 2.6 | 0.3 | 2.2 | 3 | 1 | 0 | 0.3 min | | placement | 9.5 | 0.0 | 9.5 | 31 | 5 | 3 | 0.0 min | | routing | 59.4 | 0.0 | 59.4 | 69 | 6 | 1 | 0.0 min |-| pours | 4.7 | 0.0 | 4.7 | 16 | 1 | 0 | 0.0 min |+| pours | 4.7 | 0.0 | 4.7 | 17 | 2 | 0 | 0.0 min | | current | 77.8 | 0.0 | 77.8 | 120 | 1 | 0 | 0.0 min | | thermal | 54.8 | 0.0 | 54.8 | 258 | 1 | 0 | 0.0 min | | components | 66.3 | 0.0 | 66.3 | 386 | 2 | 1 | 0.0 min |@@ -42,10 +42,10 @@ AI time only, the idle cut out. | libraries | 3.8 | 0.0 | 3.8 | 18 | 2 | 0 | 0.0 min | | models | 15.3 | 0.0 | 15.3 | 30 | 2 | 0 | 0.0 min | | outline | 0.1 | 0.0 | 0.1 | 2 | 1 | 0 | 0.0 min |-| rules | 1247.9 | 0.0 | 1247.9 | 14 | 1 | 0 | 0.0 min |+| rules | 1249.1 | 0.0 | 1249.1 | 14 | 1 | 0 | 0.0 min | | test-plan | 0.7 | 0.0 | 0.7 | 10 | 2 | 0 | 0.0 min |-| thermal-vias | 26.9 | 0.0 | 26.9 | 178 | 5 | 0 | 0.0 min |-| **total** | **1572.2** | **0.3** | **1571.9** | | | | |+| thermal-vias | 27.3 | 0.0 | 27.3 | 180 | 5 | 0 | 0.0 min |+| **total** | **1573.8** | **0.3** | **1573.4** | | | | | ## Returns to earlier steps @@ -174,6 +174,7 @@ AI time only, the idle cut out. - 2026-10-12T01:15:29Z capture-stop - 2026-10-12T01:15:58Z clip-start:routing-6 - 2026-10-12T01:16:49Z clip-start:thermal-vias-5+- 2026-10-12T01:18:22Z clip-start:pours-2 ## Where the board stands @@ -710,12 +711,34 @@ What this step does: Heatsink vias where the heat is: for every part that dissip Why the AI came back here: Existing routing retained; check local thermal paths without claiming heatsink qualification -**Clip: thermal-vias, visit 5, still recording (started 2026-10-12T01:16:49Z); it appears here when the step ends.**+**Clip: thermal-vias, visit 5, the PCB editor from 2026-10-12T01:16:49Z to 2026-10-12T01:18:12Z. Motion only: 1.4 min of real time, 0 s of it had something moving; the clock in the corner is the real elapsed time.**++<video width="100%" controls><source src="/blob/app/adom-custom-electronic-load/docs/runs/board-codex-20261007-1749/thermal-vias-5.mp4" type="video/mp4"></video>++**Contact sheet: nine frames spread through the thermal-vias, visit 5 clip, what the camera saw.**++ **Screenshot: the board when thermal-vias, visit 5 began.**  +**Screenshot: the board when thermal-vias, visit 5 ended.**++++### pours, visit 2++What this step does: pour every net the spec names, keepouts along Kelvin taps, thermal and stitching vias, land, measure the copper kept++Why the AI came back here: Board32 via-count review retains seven D1 and three shunt vias; Q1 direct heatsink qualification remains open++**Clip: pours, visit 2, still recording (started 2026-10-12T01:18:22Z); it appears here when the step ends.**++**Screenshot: the board when pours, visit 2 began.**+++ ## Plan usage, the second cost line Percent of each plan limit used, as the provider reports it, at the start of the run and at its end.
docs/runs/board-codex-20261007-1749/shot-pours-2-start.pngadded⋯ 1 unchanged line ⋯
docs/runs/board-codex-20261007-1749/shot-thermal-vias-5-end.pngadded⋯ 1 unchanged line ⋯
docs/runs/board-codex-20261007-1749/thermal-vias-5-sheet.pngadded⋯ 1 unchanged line ⋯
docs/runs/board-codex-20261007-1749/thermal-vias-5.mp4added⋯ 1 unchanged line ⋯