project
Adom Custom Electronic Load
Public Made by Adomby adom
Two-layer digitally controlled electronic-load prototype. Compact R11 is under active electrical, cooling and probe-access review; not a manufacturing release.
← Commit history
aiflow run board-codex-20261007-1749: thermal
4 files changed
+34−13
docs/runs/board-codex-20261007-1749/README.md+34−13@@ -1,6 +1,6 @@ # AI Flow run: codex on board-0 -**Running**: step `current`, 567.9 min of AI time since the prompt (3247.4 min on the wall clock). This page updates at every step change.+**Running**: step `thermal`, 791.0 min of AI time since the prompt (4194.3 min on the wall clock). This page updates at every step change. Prompt at 2026-10-07T17:49:14Z (UTC). Flow: board. Every number here is from the run's append-only ledger (run.jsonl). AI time is the time the AI was working on a prompt: from the human's prompt to the AI's done, with any gap over 15 min where no command ran (unobserved, not proven idle) cut out. @@ -20,8 +20,9 @@ One row per human prompt: the AI's time on it, unobserved gaps excluded by the h | 8 | 2026-10-09T12:31:28Z | (open) | 24.5 | 31 | Resume the electronic load through all AIFlow design gates after dashboard corrections; co | | 9 | 2026-10-09T13:26:48Z | (open) | 198.1 | 88 | Continue original electronic-load objective. Compact 5 W prototype is the working basis fr | | 10 | 2026-10-09T18:12:40Z | (open) | 10.1 | 99 | Resume electronic-load completion: inspect native board, land reviewed diode thermal vias |-| 11 | 2026-10-09T20:02:16Z | (open) | 62.0 | 172 | Continue board 18 to completion; resolve package-mounted cooling and thermal solver suppor |-| **all** | | | **567.9** | | |+| 11 | 2026-10-09T20:02:16Z | (open) | 220.9 | 861 | Continue board 18 to completion; resolve package-mounted cooling and thermal solver suppor |+| 12 | 2026-10-10T14:04:14Z | (open) | 64.2 | 35 | Continue electronic-load engineering and recorded workflow; magnetic-field question withdr |+| **all** | | | **791.0** | | | ## Per step @@ -33,16 +34,17 @@ AI time only, the idle cut out. | placement | 9.0 | 0.0 | 9.0 | 28 | 4 | 3 | 0.0 min | | routing | 59.2 | 0.0 | 59.2 | 67 | 5 | 1 | 0.0 min | | pours | 4.7 | 0.0 | 4.7 | 16 | 1 | 0 | 0.0 min |-| current | 0.0 | 0.0 | 0.0 | 1 | 1 | 0 | 0.0 min |+| current | 77.8 | 0.0 | 77.8 | 120 | 1 | 0 | 0.0 min |+| thermal | 0.0 | 0.0 | 0.0 | 1 | 1 | 0 | 0.0 min | | components | 11.9 | 0.0 | 11.9 | 28 | 1 | 0 | 0.0 min | | design | 2.5 | 0.0 | 2.5 | 11 | 1 | 0 | 0.0 min | | libraries | 1.4 | 0.0 | 1.4 | 6 | 1 | 0 | 0.0 min | | models | 0.6 | 0.0 | 0.6 | 4 | 1 | 0 | 0.0 min | | outline | 0.1 | 0.0 | 0.1 | 2 | 1 | 0 | 0.0 min |-| rules | 449.0 | 0.0 | 449.0 | 14 | 1 | 0 | 0.0 min |+| rules | 594.3 | 0.0 | 594.3 | 14 | 1 | 0 | 0.0 min | | test-plan | 0.1 | 0.0 | 0.1 | 5 | 1 | 0 | 0.0 min | | thermal-vias | 26.9 | 0.0 | 26.9 | 177 | 4 | 0 | 0.0 min |-| **total** | **567.9** | **0.3** | **567.6** | | | | |+| **total** | **791.0** | **0.3** | **790.6** | | | | | ## Returns to earlier steps @@ -96,14 +98,16 @@ AI time only, the idle cut out. - 2026-10-09T23:52:25Z capture-stop - 2026-10-09T23:56:27Z clip-start:outline-1 - 2026-10-09T23:56:36Z clip-start:current-1+- 2026-10-09T23:56:59Z capture-stop+- 2026-10-10T13:01:38Z artifact analysis-image for current-1: Candidate v27 native copper review at fine-mesh hotspots; current screen failed, board not landed ## Where the board stands - routing: 0 unrouted after null passes - gate: 0 new DRC errors, 0 unconnected, null inherited - landed live: 0 of 0 route entries-- pours: 1 groups, failed []-- copper kept (mm2 per layer): {"B.Cu":2653.06,"F.Cu":2684.25}+- copper kept (mm2 per layer): {"B.Cu":2952.03,"F.Cu":2737.55}+- analyze-current: pass ## The steps on camera @@ -405,31 +409,48 @@ What this step does: Round the board's corners: every sharp outline corner becom What this step does: IPC-2221 on every loaded net, pour and via capacity, the same-layer rule; then the AI's own current density drawing and a walkthrough of the pours it judged -**Clip: current, still recording (started 2026-10-09T23:56:36Z); it appears here when the step ends.**+**Clip: current, the PCB editor from 2026-10-09T23:56:36Z to 2026-10-09T23:56:59Z. Motion only: 0.4 min of real time, 1 s of it had something moving; the clock in the corner is the real elapsed time.**++<video width="100%" controls><source src="/blob/app/adom-custom-electronic-load/docs/runs/board-codex-20261007-1749/current-1.mp4" type="video/mp4"></video>++**Contact sheet: nine frames spread through the current clip, what the camera saw.**++ **Screenshot: the board when current began.**  +**The AI's drawing: Candidate v27 native copper review at fine-mesh hotspots; current screen failed, board not landed**++++### thermal++What this step does: copper and vias at every hot tab against the rise budget; then the AI's own temperature rise drawing and a walkthrough of the pours it judged++**Clip: thermal, still recording (started 2026-10-10T15:43:32Z); it appears here when the step ends.**+ ## Plan usage, the second cost line Percent of each plan limit used, as the provider reports it, at the start of the run and at its end. | Provider | Limit | At start | At end | Used by this run | |---|---|---|---|---|-| claude | 5h | 17 % | 5 % | -12.0 % |+| claude | 5h | 17 % | 15 % | -2.0 % | | claude | Fable | 0 % | 3 % | 3.0 % |-| claude | week | 54 % | 71 % | 17.0 % |-| codex | week | 2 % | 38 % | 36.0 % |+| claude | week | 54 % | 76 % | 22.0 % |+| codex | week | 2 % | 56 % | 54.0 % | *The limits are per account, not per run: every AI thread signed in as this user draws on the same numbers, so a run made while other threads were working shows their usage too. Read it as an upper bound unless this run was the only thread active.* ## Given back -3 issue(s) or PR(s) filed by this run's AI to make the tool better for every Adom user:+4 issue(s) or PR(s) filed by this run's AI to make the tool better for every Adom user: - pr https://wiki.adom.inc/adom/adom-aiflow/prs/32: Browser access classifier and required off-board component wiki coverage; tested candidate, awaiting owner merge and release - issue https://wiki.adom.inc/adom/adom-aiflow/issues/40: Stale pour plan hid diode cooling-via candidates after a native zone relocation; request input freshness checks. - issue https://wiki.adom.inc/adom/component-hero/issues/1: Mechanical-only fan mounting footprint has no copper pads; generator needs a genuine mechanical hero path.+- pr https://wiki.adom.inc/adom/adom-fields/prs/9: Distributed plated-wall coupling and removed drill voids; 32 tests; stacked owner review, shared runtime unchanged Adom processes PRs within minutes during business hours: a non-stop PR intake runs all day.
docs/runs/board-codex-20261007-1749/current-1-analysis-image-0.pngadded⋯ 1 unchanged line ⋯
docs/runs/board-codex-20261007-1749/current-1-sheet.pngadded⋯ 1 unchanged line ⋯
docs/runs/board-codex-20261007-1749/current-1.mp4added⋯ 1 unchanged line ⋯