← Commit history

Publish moving sensor access-hole after review directly from arav-rog

John Lauer ·15d90118fc · ·parent d33b4fb
3 files changed +9−1
docs/remote-service-clips.md+9−1
@@ -10,4 +10,12 @@ A 14.67-second moving assembly orbit and heatsink layer reveal. This shows the s 
 [Download clip](../videos/remote-service/before.mp4)
 
-The after-revision clip will be added after the revised assembly is ready to review. No hardware qualification is implied.
+
+
+## After: sensor screw access through FR4
+
+Moving assembly orbit, heatsink reveal and underside pan. The 6.8 mm sensor access hole is now visible beside the Q1 access opening. The sensor mount moved 8 mm laterally and 0.5 mm toward Q1; affected traces and labels were revised. Native DRC reports zero violations and zero opens. This is a candidate geometry review; complete service/tool, probing and thermal acceptance remain open.
+
+::adom-video{video="/adom/adom-custom-electronic-load/render/videos/remote-service/after.mp4" poster="/adom/adom-custom-electronic-load/render/videos/remote-service/after.jpg"}
+
+[Download after clip](../videos/remote-service/after.mp4)
videos/remote-service/after.jpgadded
⋯ 1 unchanged line ⋯
videos/remote-service/after.mp4added
⋯ 1 unchanged line ⋯